PT Angkasa Pura II, as the operator of Soekarno-Hatta International Airport (SHIA), said it has started to do the construction of the airport station. The station was built to support the CommuterLine services between the airport with the New Sudirman Station.
Salahuddin Rafi, Director of Airport Development and Technology of PT AP II, revealing the construction process will take more than 1 year. The Airport Station will be operated at the end of 2015.
The location of the station is located between the integrated buildings of SHIA. From the aspect of architecture design, SHIA Airport Station is designed to resemble the architecture of Kuala Namu Airport Rail Station in North Sumatra.